Focus - Man Power, Equipments, Procedure

Manpower

  • Competent work force of 1100 personal
  • 700 Permanent
  • 400 Contractual
  • Qualified and skilled manpower
  • Good command over English
  • International exposure & experience
  • Conversant with modern oil & gas drilling operations and maintenance
  • Regular training to man power which enhances operating & maintenance skills for running drilling rigs efficiently, professionally and in safe manner

Equipments

  • 21 land rigs and 3 Gas Compressor Units
  • Maintained in excellent conditions
  • PMS in place and effective
  • Refurbishment as per schedule
  • Scrapping of age old equipments
  • Our own Rig Manufacturing unit
  • Our own fully equipped oil field standard work shop
  • Proper storage and stacking yard
  • Back up material procurement and logistic support

IMS Procedure

  • System Procedure on Control of Document
  • System Procedure on Control of Record
  • System Procedure on Internal Audit
  • System Procedure on Control of Non Conforming Product
  • System Procedure on Corrective and preventive action
  • System Procedure on Management Review Meeting
  • System Procedure on Management Information System
  • System Procedure on Customer Property
  • System Procedure on Identification of Legal requirement
  • Procedure on establishing objectives & Management program
  • System Procedure on Emergency Response Procedure
  • System Procedure on Emergency Drill procedure
  • System Procedure on Inspection and testing of drilling process Equipment
  • System Procedure on Accident/Incident Reporting
  • System procedure on Hazards identification and Risk management
  • System procedure on identification of aspect and impact
  • System Procedure on Waste Management
  • System Procedure on Identification of Hazardous Area
  • System procedure on Consultation, Communication & Participation
  • System Procedure on Use of Fire Extinguishers for Different Types of Fire
  • System Procedure on Use of PPE
  • System Procedure on Journey Management
  • System Procedure on First Aid
  • System Procedure on Contract Review
  • System Procedure on Purchase
  • System Procedure on emergency purchase with no budget provision
  • System Procedure on Store
  • System Procedure on handling Site requisition
  • System Procedure on use and storage of compressed Gas Cylinder
  • System procedure on planning
  • System procedure on provision of services
  • System procedure on provision of services (Compressor)
  • System procedure on Material handling
  • System Procedure on HRD
  • System Procedure on New Recruitment
  • System Procedure on Training
  • System Procedure on Maintenance Management
  • OCP on Chemical Management
  • OCP on Drilling line and hoisting Equipment Wire Rope maintenance
  • OCP on Spill prevention
  • OCP on Application of Auxiliary brake (Eddy current brake)
  • OCP on Bottom Hole Assembly (BHA) Inspection
  • OCP on Inspection of different Types of Fire Extinguishers
  • OCP on Lifting gear inspection
  • OCP on testing of BOPs, Choke & Kill Manifold and Well Fluid Line
  • OCP on Rig and Camp move procedure
  • OCP on Confined spaces
  • OCP on Fire prevention
  • OCP on Fire protection
  • OCP on Gas Monitoring
  • OCP on Handling Tubular
  • OCP on H2S safety
  • OCP on Issuing safe work permit
  • OCP on Monitoring of Atmospheric Emission
  • OCP on Rig up and Rig move-LCI 550
  • OCP on Rig up and spudding procedure on DSII make drilling Rig
  • OCP on Electricity & safety during maintenance of Electrical Equipment
  • OCP on Welding
  • OCP on Well control Practices
  • OCP on Rotation and Tour handover
  • OCP on Medical evacuation
  • OCP on Noise level monitoring
  • Guideline for Rigging up/down
  • System procedure on Monitoring and measurement
  • System procedure on Logistic control
  • System procedure on change management
  • System procedure on safety meeting
  • System Procedure on Quality Assurance of inspection of Incoming Material, Inprocess & Final inspection of Product/Service
  • System procedure on Performance Monitoring
  • System Procedure on Health Surveillance
  • System Procedure on working on a Extreme Climate
  • System procedure on monitoring of illumination of a Work place
  • OCP for handling Corrosion Resistant Tubular
  • System procedure on evaluating pre-qualification of Supplier/Service Provider
  • System procedure on Grievance Redressal
  • OCP on safe operation & servicing of Gas Compression

Home|Contact Us|Sitemap

The Company|Focus - MEP|Spectrum of Services|Rig Fleet|Policies|John in News|Clientele|Careers

© 2005-2010 John Energy Ltd. | All Rights Reserved. | Contact: john@johnenergy.com